Pages

Thursday, August 19, 2010

DesignProgress 190710


I've been working on the hulls again. And will be working on them even more. I was disatisfied with the entry points in the hulls, need a safer entry point for the fore cabins as well. I'll probably ditch the central pod, uselless weight in the stay rig configuration.

Sunday, August 8, 2010

DesignProgress 080810



New central pod si now part of the rig support structure, made from developable foam panels, 'stitched' and glued. The new pod is also the support for the centerboard, side loads taken by side stays to the hulls.

Tuesday, August 3, 2010

RigCandidate



Posible StayRig setup, lower CoE for the same SA, easier reefing, better beam setup.